New home handover checklist (room by room)

Do this walk-through before you sign off. Bring a torch, a phone charger to test power points, a coin to tap tiles, and masking tape to mark defects.

Outside and site

  • Ground falls away from the house on all sides Look for low spots against walls where water would pool
  • Stormwater pits and downpipes connected, grates in place Check every downpipe enters a pit or pipe, not onto the ground
  • Driveway and paths: no cracks, even surface, finished as per contract Check expansion joints and edges
  • Fencing, retaining walls and letterbox as per contract Compare with your inclusions list
  • External taps work and don't leak Run each tap
  • Landscaping, turf and clothesline as per contract Only if included
  • Rubbish, offcuts and site materials removed Check side passages and behind the garage
  • Meter boxes, NBN pit and gas meter installed and labelled

Roof, gutters and eaves

  • Roof tiles or sheets straight, none cracked or missing Look from the street and back yard (binoculars help)
  • Ridge capping and flashings neat and sealed
  • Gutters fall to downpipes, no sagging or overflow marks Hose test if you can
  • Eaves and soffit linings straight, painted, no gaps
  • Fascias and barge boards straight and painted

External walls and cladding

  • Brickwork: even mortar joints, no cracked or chipped bricks Look along each wall at an angle
  • Weep holes clear (not blocked by mortar or garden beds) Check every wall above the damp course
  • Articulation (control) joints present and sealed
  • Render or cladding: no cracks, consistent finish, fixings not exposed
  • Paint: even coverage, no overspray on brick, glass or fittings
  • Sills and window head flashings in place

Windows and external doors

  • Every window opens, closes and locks smoothly Try every one
  • Glass not scratched, chipped or cracked Look at it against the light
  • Flyscreens fitted and not torn
  • External doors close, latch and lock; seals and weather strips fitted
  • Door hardware tight and as per specification
  • Garage door runs smoothly; remotes supplied and working Test the safety stop
  • Keys for every lock supplied and labelled

Entry, hallways and living areas

  • Front door, door stops and hardware installed
  • Internal doors swing freely, latch, and have even gaps Close each door and look at the gap
  • Skirting and architraves: tight joints, no gaps to walls
  • Ceiling and cornices: no cracks, sags or gaps Use a torch held flat against the ceiling
  • Light fittings and switches as per plan
  • Windows and window furnishings as per contract

Kitchen

  • Benchtops: no chips or scratches, joins tight, level
  • Cabinet doors and drawers aligned, soft-close working, handles tight Open and close every one
  • Splashback complete, grouted or sealed, no cracked tiles
  • Sink and tap: no leaks, hot and cold correct, good flow Check under the sink with a torch
  • Oven, cooktop, rangehood and dishwasher installed and working Turn each on
  • Rangehood ducted outside (if specified)
  • Silicone neat and continuous around sink and benchtop
  • Power points and appliance circuits as per plan

Bathrooms and ensuite

  • Floor falls to the waste: no ponding after a shower test Run the shower for 5 minutes and look for pooling
  • Tiles: no cracks or chips, even edges (lippage), grout complete
  • Tap test floor and wall tiles for hollow ('drummy') sounds Tap gently with a coin; mark hollow areas
  • Shower screen: no leaks, seals fitted, door closes
  • Silicone around bath, shower, vanity and toilet: neat and complete
  • Toilet secure, flushes properly, no leaks at base
  • Vanity and mirror secure; taps hot and cold correct
  • Exhaust fan works and vents outside or to the roof as specified Hold a tissue up to it
  • Towel rails, toilet roll holders and accessories installed

Laundry

  • Tub, cabinet and tap installed, no leaks
  • Washing machine taps installed and turned off
  • Floor waste present and floor falls to it
  • Exhaust or ventilation as specified

Bedrooms and robes

  • Robe doors slide or swing freely and align
  • Robe shelves and hanging rails fitted and level
  • Doors, skirting and windows finished (as for living areas)
  • Carpet or flooring finished to the door frame

Floors

  • Floor tiles: no cracks, chips or hollow sounds, even grout Coin tap test
  • Timber or hybrid: no gaps, cupping, scratches or squeaks Walk the whole floor
  • Carpet: seams not visible, stretched tight, no ripples
  • Transitions between floor types neat and level

Walls, ceilings and paint

  • Plaster: no cracks, nail pops or visible joins Torch held flat to the wall shows bumps
  • Paint: even coverage, no patchiness, drips or marks Look in daylight and with lights on
  • Paint lines cut neatly at ceilings and trims
  • Wall and ceiling junctions straight

Electrical

  • Every power point works Use a plug-in tester or phone charger
  • Every light and switch works
  • Smoke alarms installed in required locations and interconnected Press test: all should sound together if interconnected
  • Safety switches (RCDs) test correctly at the switchboard Press the test button
  • Switchboard labelled
  • TV, data and NBN points as per plan
  • Ceiling fans and exhaust fans work

Plumbing, hot water and gas

  • Hot water system installed and working; hot water reaches every tap
  • No leaks under any sink, vanity or tub Torch check and dry tissue test
  • Water pressure good at all taps
  • Gas appliances connected and working
  • Water meter reading recorded at handover Photograph it

Heating, cooling and ventilation

  • Air conditioning units run, heat and cool
  • Vents and grilles fitted in every room as per plan
  • Remote controls and manuals supplied

Garage

  • Slab: no significant cracks; finished as specified
  • Internal access door installed; self-closing if required
  • Power points and lights work

Documents to collect

  • Occupancy certificate / certificate of final inspection
  • Waterproofing certificate(s)
  • Electrical certificate of compliance
  • Plumbing compliance certificate
  • Termite management certificate and durable notice
  • Smoke alarm compliance
  • Glazing certificate (if required)
  • Home warranty insurance certificate
  • Appliance manuals and warranties
  • Paint colour and product schedule
  • All keys, remotes and access devices
  • Final invoice and statement of payments

Inspect your new home on your phone

Work through 80+ checks room by room and log every defect with photo references. Then get a numbered defects report and a letter for your builder. The checklist is free.

Start my inspection My deadlines

More: Practical completion inspection: a buyer's guide · Shower ponding: test the falls before you take handover · Drummy tiles: check them before handover · Weep holes: check they're clear before handover · New home defects in NSW: your warranty rights · New home defects in Victoria: your rights · Queensland: the defects document and home warranty deadlines · Documents to collect at handover