New home handover checklist (room by room)
Do this walk-through before you sign off. Bring a torch, a phone charger to test power points, a coin to tap tiles, and masking tape to mark defects.
Outside and site
- Ground falls away from the house on all sides Look for low spots against walls where water would pool
- Stormwater pits and downpipes connected, grates in place Check every downpipe enters a pit or pipe, not onto the ground
- Driveway and paths: no cracks, even surface, finished as per contract Check expansion joints and edges
- Fencing, retaining walls and letterbox as per contract Compare with your inclusions list
- External taps work and don't leak Run each tap
- Landscaping, turf and clothesline as per contract Only if included
- Rubbish, offcuts and site materials removed Check side passages and behind the garage
- Meter boxes, NBN pit and gas meter installed and labelled
Roof, gutters and eaves
- Roof tiles or sheets straight, none cracked or missing Look from the street and back yard (binoculars help)
- Ridge capping and flashings neat and sealed
- Gutters fall to downpipes, no sagging or overflow marks Hose test if you can
- Eaves and soffit linings straight, painted, no gaps
- Fascias and barge boards straight and painted
External walls and cladding
- Brickwork: even mortar joints, no cracked or chipped bricks Look along each wall at an angle
- Weep holes clear (not blocked by mortar or garden beds) Check every wall above the damp course
- Articulation (control) joints present and sealed
- Render or cladding: no cracks, consistent finish, fixings not exposed
- Paint: even coverage, no overspray on brick, glass or fittings
- Sills and window head flashings in place
Windows and external doors
- Every window opens, closes and locks smoothly Try every one
- Glass not scratched, chipped or cracked Look at it against the light
- Flyscreens fitted and not torn
- External doors close, latch and lock; seals and weather strips fitted
- Door hardware tight and as per specification
- Garage door runs smoothly; remotes supplied and working Test the safety stop
- Keys for every lock supplied and labelled
Entry, hallways and living areas
- Front door, door stops and hardware installed
- Internal doors swing freely, latch, and have even gaps Close each door and look at the gap
- Skirting and architraves: tight joints, no gaps to walls
- Ceiling and cornices: no cracks, sags or gaps Use a torch held flat against the ceiling
- Light fittings and switches as per plan
- Windows and window furnishings as per contract
Kitchen
- Benchtops: no chips or scratches, joins tight, level
- Cabinet doors and drawers aligned, soft-close working, handles tight Open and close every one
- Splashback complete, grouted or sealed, no cracked tiles
- Sink and tap: no leaks, hot and cold correct, good flow Check under the sink with a torch
- Oven, cooktop, rangehood and dishwasher installed and working Turn each on
- Rangehood ducted outside (if specified)
- Silicone neat and continuous around sink and benchtop
- Power points and appliance circuits as per plan
Bathrooms and ensuite
- Floor falls to the waste: no ponding after a shower test Run the shower for 5 minutes and look for pooling
- Tiles: no cracks or chips, even edges (lippage), grout complete
- Tap test floor and wall tiles for hollow ('drummy') sounds Tap gently with a coin; mark hollow areas
- Shower screen: no leaks, seals fitted, door closes
- Silicone around bath, shower, vanity and toilet: neat and complete
- Toilet secure, flushes properly, no leaks at base
- Vanity and mirror secure; taps hot and cold correct
- Exhaust fan works and vents outside or to the roof as specified Hold a tissue up to it
- Towel rails, toilet roll holders and accessories installed
Laundry
- Tub, cabinet and tap installed, no leaks
- Washing machine taps installed and turned off
- Floor waste present and floor falls to it
- Exhaust or ventilation as specified
Bedrooms and robes
- Robe doors slide or swing freely and align
- Robe shelves and hanging rails fitted and level
- Doors, skirting and windows finished (as for living areas)
- Carpet or flooring finished to the door frame
Floors
- Floor tiles: no cracks, chips or hollow sounds, even grout Coin tap test
- Timber or hybrid: no gaps, cupping, scratches or squeaks Walk the whole floor
- Carpet: seams not visible, stretched tight, no ripples
- Transitions between floor types neat and level
Walls, ceilings and paint
- Plaster: no cracks, nail pops or visible joins Torch held flat to the wall shows bumps
- Paint: even coverage, no patchiness, drips or marks Look in daylight and with lights on
- Paint lines cut neatly at ceilings and trims
- Wall and ceiling junctions straight
Electrical
- Every power point works Use a plug-in tester or phone charger
- Every light and switch works
- Smoke alarms installed in required locations and interconnected Press test: all should sound together if interconnected
- Safety switches (RCDs) test correctly at the switchboard Press the test button
- Switchboard labelled
- TV, data and NBN points as per plan
- Ceiling fans and exhaust fans work
Plumbing, hot water and gas
- Hot water system installed and working; hot water reaches every tap
- No leaks under any sink, vanity or tub Torch check and dry tissue test
- Water pressure good at all taps
- Gas appliances connected and working
- Water meter reading recorded at handover Photograph it
Heating, cooling and ventilation
- Air conditioning units run, heat and cool
- Vents and grilles fitted in every room as per plan
- Remote controls and manuals supplied
Garage
- Slab: no significant cracks; finished as specified
- Internal access door installed; self-closing if required
- Power points and lights work
Documents to collect
- Occupancy certificate / certificate of final inspection
- Waterproofing certificate(s)
- Electrical certificate of compliance
- Plumbing compliance certificate
- Termite management certificate and durable notice
- Smoke alarm compliance
- Glazing certificate (if required)
- Home warranty insurance certificate
- Appliance manuals and warranties
- Paint colour and product schedule
- All keys, remotes and access devices
- Final invoice and statement of payments
Inspect your new home on your phone
Work through 80+ checks room by room and log every defect with photo references. Then get a numbered defects report and a letter for your builder. The checklist is free.
Start my inspection My deadlinesMore: Practical completion inspection: a buyer's guide · Shower ponding: test the falls before you take handover · Drummy tiles: check them before handover · Weep holes: check they're clear before handover · New home defects in NSW: your warranty rights · New home defects in Victoria: your rights · Queensland: the defects document and home warranty deadlines · Documents to collect at handover